Manufacturers and factories

Billing and stock for manufacturers

Say what goes into each product, record production so raw material goes down as finished goods go up, see profit by unit or product line, and invoice, e-invoice and ship from the same place.

What gets in the way, and how Zebill helps

Raw material that never adds up

A bill of materials on each product, and production entries that move the stock for you.

Running out mid-batch

Reorder levels on raw materials, and suggestions based on what you actually use.

More than one unit or godown

Stock by warehouse and transfers between the factory, godown and branches.

Which line makes money?

Tag bills, purchases and expenses with a cost centre and see profit for each.

The features you will use most

Bill of materials

What goes into one unit of each product.

Production entries

“Make” moves raw and finished stock.

Warehouses and transfers

Stock by location, moved in one entry.

Cost centres

Profit by unit, site or product line.

Purchase orders

Order raw material, match the bills.

E-invoicing support

E-invoice JSON, IRN and QR on the bill.

Set up in one step

Pick “Manufacturing” and Zebill starts with

  • Products tracked by batch, with Nos as the starting unit
  • 30-day payment terms by default
  • Manufacturing, cost centres, purchase orders, e-way bill, 2B matching, TDS and TCS turned on
  • A manufacturer print style

Screens made for other trades stay out of your way. You can turn anything on or off at any time in Settings.

Made to fit

Work a little differently? We will shape Zebill around you.

Every business has its own way of doing things. If you need an extra field on your bills, a print layout your customers expect, a report your accountant asks for, or a step that is special to your trade, tell us. Our team will set it up for you, so Zebill works the way you already do.

Tell us what you need

A day on a small factory floor and in its office

Take a unit that makes steel kitchen racks. In the morning the owner opens the open sales orders and sees the dealer’s order for two hundred racks. A work order is created against the bill of materials: steel tube, wire, powder coat, packing carton. The raw material needed is checked against stock, and the shortage of coating powder becomes a purchase order before anyone has started cutting.

During the day, production runs are recorded as batches finish. Each run moves raw material out and finished racks in, and it records scrap, such as offcuts, as its own product. A partial run of eighty racks leaves the order open for the remaining hundred and twenty. Labour and overheads can be added to the work order so the cost of one rack is known, not guessed.

In the evening, dispatch. Make the invoice for the racks that left, download the e-way bill file, and for larger businesses the e-invoice file. If some parts are sent to a job worker for plating, issue a job work challan and record what returns with its waste. The ITC-04 summary at the end of the period shows what is still out. The owner closes by checking profit by product line through cost centres.

What a manufacturer’s invoice must show

A factory issues several kinds of documents. The tax invoice for finished goods needs these details.

Manufacturing invoice fields
FieldWhy it mattersExample
HSN of the finished productDetermines the rate; check on the HSN finder or with your CASteel racks with their own HSN
Batch or lot numberTraceability if a customer finds a defectLot R-0415
Buyer GSTIN and place of supplySets the tax type and lets the buyer claim creditIGST for an inter-state dealer
Purchase order referenceLarge buyers match your bill to their PO before payingCustomer PO 7781
E-invoice IRN and QRRequired above the turnover threshold; check whether it applies to youIRN printed after the portal returns it
Transport and e-way billNeeded for movement of goods above the limitVehicle number and e-way bill reference
UAE: TRN and VAT, designated zone notesGoods in or out of free zones may be treated differently; confirm with your tax agentAED 52,000 with VAT shown

Documents a manufacturer issues

  • Sales order. The buyer’s commitment, which becomes a work order.
  • Work order. What to make, how many, by when, and from which materials.
  • Purchase order. For raw material, matched to the supplier’s bill.
  • Job work challan. For goods sent out for plating, stitching or machining, with a deadline to bring them back.
  • Tax invoice and delivery challan. For finished goods dispatched.
  • Credit note and debit note. For rejected lots and rate differences.
  • E-invoice file and e-way bill file. Prepared from the invoice for upload on the portals.

Setting up Zebill for a small factory

  1. Choose Manufacturing as the industryBatch tracking, 30-day terms and manufacturing features come ready.
  2. Add raw materials and finished goodsSeparate products, each with a unit and an HSN.
  3. Write the bill of materialsFor each finished product list the materials per unit, with allowed wastage.
  4. Enter opening stock by warehouseFactory, godown and any branch, so transfers work.
  5. Add cost centresOne per unit or product line to see profit separately.
  6. Turn on e-invoicing only if it appliesAsk your CA; it is off by default.
  7. Set reorder levels on raw materialsAnd let purchase suggestions follow real usage.

Common mistakes and how to avoid them

  • Production not recorded. Without entries, stock of raw and finished goods drifts and cost is guesswork.
  • Ignoring scrap. Move it to its own product so wastage is visible and valued.
  • Job work that never comes back. Check the out list and deadline each month; the ITC-04 summary shows what remains.
  • Costing on material only. Add labour and overheads to the work order for a real cost per unit.
  • Using a retail setup. Pick Manufacturing, so work orders, cost centres and job work are available.

Month-end checklist for a manufacturer

  • Raw material and finished stock count. Compare by warehouse and adjust for scrap and shrinkage.
  • Open work orders. Close finished ones and review delayed ones.
  • Job work status. Review goods still with job workers against the deadline.
  • Cost per unit. Compare to selling price by product line.
  • Returns and summaries. India: GSTR-1, GSTR-3B, GSTR-2B match, ITC-04, TDS and TCS. UAE: the VAT 201 summary. Then the CA pack.

Paper job sheets and spreadsheets versus Zebill

Main manufacturing jobs
JobJob sheets and spreadsheetsZebill
Material for an orderCalculator and memoryBill of materials and a work order
Stock after productionAdjusted at month endMoved by each production run
Cost per unitAn estimateMaterials, labour and overheads per unit
Job work trackingA register of challansSent, returned and still out, with ITC-04
Profit by lineSeparate sheetsCost centre reports

Common questions

Is this a full production planning (MRP) system?

No. Zebill keeps a simple bill of materials and records production so stock stays right. It does not plan machines, shifts or work orders.

Does Zebill support e-invoicing?

Yes. It prepares the e-invoice JSON for you to upload on the IRP, then prints the IRN and signed QR code on the invoice. It does not connect to the portal itself. See e-invoicing.

Can I move stock between the factory and the godown?

Yes. Stock is kept by warehouse, and a stock transfer moves it from one to another.

Can I make a product that uses another product I made?

Yes. A finished product can be a material in another bill of materials, so sub-assemblies work.

Can I record a rejected batch?

Record the rejected quantity as scrap or issue a debit note to the supplier, depending on where the fault was.

Does Zebill plan machine time or shifts?

No. It covers work orders, production, stock and cost. Use a separate tool if you need detailed scheduling.

Can I see raw material needed for all open orders together?

You can see each work order’s requirement against stock. For a total, review open orders together before buying.

Zebill for manufacturing

Zebill is free while we are in early access. Set up your business in a few minutes and make your first invoice.