Manufacturing
Plan it, make it, know what it cost
Work orders from your bill of materials, production runs that move the raw material and finished stock, the real cost per unit, and goods sent to job workers with the deadline to bring them back.
Manufacturing and job work: what it does
Work orders
What to make, for whom and by when.
Production runs
Materials used, scrap and finished goods in stock.
Cost per unit
Materials, labour and overheads per piece made.
Job work challans
Sent, used, returned and still out, with ITC-04.
From sales order to finished goods
Turn open sales orders into work orders, record each production run, and stock updates by itself.
- Bill of materials with wastage
- Partial runs until the order is done
- Scrap moved to its own product
- Work order status: planned, in progress, done
Job work without the guesswork
Send goods to a job worker on a challan, record what comes back, and see what is still out before the one-year (or three-year) limit.
- Job work challan print
- Receipts with used, returned and waste
- ITC-04 summary for the period (India)
Made to fit
Work a little differently? We will shape Zebill around you.
Every business has its own way of doing things. If you need an extra field on your bills, a print layout your customers expect, a report your accountant asks for, or a step that is special to your trade, tell us. Our team will set it up for you, so Zebill works the way you already do.
From order to finished goods, step by step
- Define what you makeList the finished product with its bill of materials: each raw material, quantity and the wastage you normally expect.
- Create a work orderTurn an open sales order into a work order, with the quantity, the customer and the date it is due.
- Record production runsAfter each run, enter what was made and what was used. Raw materials reduce and finished goods increase.
- Handle scrapMove scrap to its own product so it is not mixed up with good stock.
- Review the costRead the cost per unit from the materials, labour and overheads, and compare it with your price.
Who uses it, and for what
- A packaged food unit. Plans batches against orders and sees how much flour or oil a run really used.
- A garment maker. Sends cut fabric to a stitching job worker and tracks what comes back.
- A small engineering workshop. Builds to order from a drawing and checks that the quoted price covers the cost.
- A packaging unit. Runs partial production until a large order is complete.
- A furniture maker. Tracks wood, hardware and labour for each piece.
- A contract manufacturer in the UAE. Produces for clients and bills with VAT after delivery.
The rules behind production and job work
Under GST, sending goods to a job worker is not a supply if it follows the job work rules. The principal can send inputs or semi-finished goods under a challan, and the goods are expected to return, or be supplied from the job worker’s place, within a set period. The period is one year for inputs and three years for capital goods, and goods not returned in time may be treated as a supply. Check the current rule with your CA.
The principal reports job work movements in ITC-04, which lists goods sent to and received from job workers. Zebill prepares the summary for the period, and you file on the portal. Getting the challans right at the start is what makes this report easy.
Cost accounting for production is a method, not an arithmetic fact. The cost of a unit made includes direct material, direct labour and a share of overheads, and the share of overheads is a choice. Be consistent, so the figures are comparable month to month.
Scrap and wastage are normal but should be measured. A bill of materials with realistic wastage keeps your cost honest, and an unexplained gap between materials in and goods out is the first sign of leakage.
The life of a work order
| Status | What it means | What changes in stock |
|---|---|---|
| Planned | Order is created, nothing made yet | Nothing yet |
| In progress | One or more runs recorded | Raw materials reduce, finished goods increase |
| Partial | Some of the order is done | Stock reflects each run |
| Done | The full quantity is made | Final stock position |
| Scrap recorded | Waste moved to its own item | Scrap stock increases |
Tips to get the most out of manufacturing
- Start with your best-selling product. Get one bill of materials right before you build the rest.
- Record runs the same day. Memory is poor at the end of the week, and stock is only accurate if runs are entered when they happen.
- Keep a job work register by date. Look at what is still out each month, well before the time limit.
- Review the cost per unit quarterly. Material prices move, and old costs make a new quote look better than it is.
- Weigh scrap, do not guess. A measured number is the only one you can improve.
Common questions
Does it make the ITC-04 return?
It prepares the ITC-04 summary of goods sent to and received from job workers for the period, as a CSV to file.
Can I see the cost of each product made?
Yes. Each work order shows the materials, labour and overheads per unit from its production runs.
Can I make a product with more than one version?
Define the bill of materials for each version as its own product, so the cost and stock of each stay separate.
Does it plan raw material purchases?
Work orders show what you are making. Combine that with the reorder suggestions in inventory to decide what to buy.
What happens if a job worker returns less than expected?
Record the receipt with the quantity used, returned and wasted. The difference is visible, and you can raise it with the job worker.
Bill with confidence from today
Zebill is free while we are in early access. Set up your business in a few minutes and make your first invoice.