Auto parts and engineering · Faridabad

GST billing for auto parts and engineering in Faridabad

An engineering city making auto parts, tractors and components for factories across the north. Zebill is set up for manufacturing: say what goes into each product, record production so raw material goes down as finished goods go up, see profit by unit or product line, and invoice, e-invoice and ship from the same place.

Manufacturing in Faridabad

GSTIN starts with
06
Sales within Haryana
CGST + SGST
Sales to other states
IGST
Set up for
Manufacturing

GST points for auto parts and engineering in Faridabad

Input tax credit on raw material

GST paid on raw material, packing and machinery can usually be claimed as input tax credit. Match your purchases with GSTR-2B before you claim.

E-invoicing when turnover needs it

Above the e-invoicing limit, B2B invoices need an IRN from the IRP. Zebill makes the e-invoice JSON and prints the IRN and QR code.

A sample manufacturing bill from Faridabad

Machined components for a buyer, ₹240,000 before tax, at 18% GST. A business buyer with a GSTIN can claim this tax as credit. Check the rate for your own items with the HSN code finder.

Customer in Haryana

Taxable value₹240,000
CGST 9%₹21,600
SGST 9%₹21,600
Invoice total₹283,200

Buyer in Delhi, Delhi

Taxable value₹240,000
IGST 18%₹43,200
GSTIN starts with07
Invoice total₹283,200

Over ₹50,000 of goods to another state: make an e-way bill before dispatch.

Selling from Faridabad to nearby markets

Buyer inStateTax on the bill
FaridabadHaryanaCGST + SGST
DelhiDelhiIGST
GurugramHaryanaCGST + SGST
NoidaUttar PradeshIGST

Other trades in Faridabad

What slows a Faridabad manufacturing business down

Raw material that never adds up

A bill of materials on each product, and production entries that move the stock for you.

Running out mid-batch

Reorder levels on raw materials, and suggestions based on what you actually use.

More than one unit or godown

Stock by warehouse and transfers between the factory, godown and branches.

Which line makes money?

Tag bills, purchases and expenses with a cost centre and see profit for each.

The features you will use most

Bill of materials

What goes into one unit of each product.

Production entries

“Make” moves raw and finished stock.

Warehouses and transfers

Stock by location, moved in one entry.

Cost centres

Profit by unit, site or product line.

Purchase orders

Order raw material, match the bills.

E-invoicing support

E-invoice JSON, IRN and QR on the bill.

Made to fit

Work a little differently? We will shape Zebill around you.

Every business has its own way of doing things. If you need an extra field on your bills, a print layout your customers expect, a report your accountant asks for, or a step that is special to your trade, tell us. Our team will set it up for you, so Zebill works the way you already do.

Tell us what you need

The factory belt of Faridabad

Faridabad is one of the oldest industrial towns around Delhi, and its factories make a broad range of goods: auto components, tractors and farm equipment parts, forgings and castings, refrigeration components, switchgear, tools, bearings and packaging. Many units are medium and small, and they supply bigger plants in the same town, in Gurugram and Manesar, and across the National Capital Region.

A common pattern is the vendor relationship. A unit machines or forges a part to a customer’s drawing, supplies it against a monthly schedule, and is paid after the buyer inspects the lot. Rejections for dimension or finish are sent back with a note, and the supplier either reworks or replaces them. Many workshops also take job work on material that the customer supplies, which changes how goods and invoices must be recorded.

The city’s road and rail links to Delhi and to the container depots on the capital’s outskirts make export easy for some units, which ship to Europe, the Middle East and Africa. The proximity of Delhi’s markets also means that small factories sell finished consumer items directly to wholesalers.

The seasonal pattern follows the plants’ calendar, with shutdown weeks around Diwali and the new year, and a surge before the financial year-end. In winter, construction and pollution rules in the NCR can limit some activities and affect delivery times.

Billing advice for Faridabad manufacturers

  • Separate own-material and customer-material jobs. Bill the full price for goods you make from your own material and only the processing charge for job work.
  • Record rejection and rework. Log rejected lots and the reason, so a debit note can be matched and your yield is visible.
  • Use schedule-wise dispatch. Dispatch and bill against the buyer’s release number so the invoice is accepted without queries.
  • Track tooling and dies. Keep a register of customer-owned and own dies, with the party each belongs to.
  • Keep export paperwork separate. Use a distinct invoice series and note shipping details for orders sent abroad.

Common questions

Is Zebill set up for auto parts and engineering in Faridabad?

Yes. Pick “Manufacturing” when you start and Zebill turns on what this trade uses: products tracked by batch, with nos as the starting unit; 30-day payment terms by default; manufacturing, cost centres, purchase orders, e-way bill, 2b matching, tds and tcs turned on. Nothing is locked; change any of it in Settings.

Which GST does a Faridabad business charge?

CGST + SGST on sales to customers inside Haryana, and IGST on sales to other states. Zebill reads the state from the customer’s GSTIN (Haryana GSTINs start with 06) or address and picks the tax for you.

Which GST applies when a Faridabad business sells to Delhi?

Delhi is in Delhi, so a sale from Faridabad (Haryana) is an inter-state supply and carries IGST, not CGST + SGST. If the goods are worth more than ₹50,000, the consignment also needs an e-way bill.

And a sale from Faridabad to Gurugram?

Both are in Haryana, so it is an intra-state sale: CGST + SGST, split equally between the two taxes.

Is this a full production planning (MRP) system?

No. Zebill keeps a simple bill of materials and records production so stock stays right. It does not plan machines, shifts or work orders.

Does Zebill support e-invoicing?

Yes. It prepares the e-invoice JSON for you to upload on the IRP, then prints the IRN and signed QR code on the invoice. It does not connect to the portal itself. See e-invoicing.

Start billing your Faridabad manufacturing business

Zebill is free while we are in early access. Set up your business in a few minutes and make your first invoice.